Dirt Road Construction Quotes

Get Professional Services

Cost of Dirt Road Construction in Abilene

Constructing a dirt road in Abilene, TX, involves various considerations that can impact the overall cost. From the type of soil to the length of the road, several factors come into play. Understanding these variables is crucial for budgeting and planning your project.

Factors Affecting Cost

  • Soil Type: The composition of the soil can significantly influence the amount of preparation and materials needed.
  • Road Length: Longer roads require more materials and labor, increasing the overall cost.
  • Terrain: Hilly or uneven terrain may need additional grading and stabilization.
  • Drainage Requirements: Proper drainage systems are essential to prevent erosion and water damage.
  • Material Quality: Higher-quality materials may have a higher upfront cost but offer better longevity.
  • Labor Costs: Labor rates in Abilene, TX, can vary based on the complexity of the job and the expertise required.

Average Costs for Common Tasks and Costs

Task Average Cost (Abilene, TX)
Soil Testing $500 - $1,000
Grading and Leveling $1,500 - $3,000 per mile
Base Layer Installation $2,000 - $4,000 per mile
Drainage Installation $1,000 - $2,500
Surface Layer Application $3,000 - $6,000 per mile
Total Cost per Mile $8,000 - $16,500

Understanding these costs and factors can help you plan effectively for your dirt road construction project in Abilene, TX.

Dirt Road Construction